SITES & INDUSTRIES
The Center, which is a Certified Industrial Site, is made up of approximately 185 acres of prime property situated on an interstate quality highway. There are approximately 125 acres presently available. Individual sites may be configured in sizes ranging from 5 to 30 acres.
The flat to gently rolling topography has slopes of less than 5%. The sites are generally clear and open. Protective covenants ensure appropriate coverage ratios, building materials, landscaping and signage. These covenants are available for review. A Phase 1 Environmental Study has been completed on this park.
| Major Companies in the Tarboro Area |
Employees |
| Sara Lee Bakery |
850 |
| Embarq |
469 |
| Keihin Carolina System Technology, Inc |
460 |
| Superior Essex |
365 |
| Air System Components |
325 |
| Barnhill Contracting Co. |
200 |
| General Foam Plastics |
200 |
| Glenoit Fabrics (HG) Corp. |
200 |
| Glenoit, LLC |
200 |
| Mayo Knitting Mill, Inc. |
200 |
| Long Agribusiness, LLC |
200 |
| Focal Point, Inc. |
100 |
| HC Composites, LLC |
100 |